Home Page





Ph: 403.938.7920 •  F: 403.938.7283 •  145 Fisher Street, Okotoks, AB, Canada

COMMERCIAL & INDUSTRIAL SURFACE WORKS

D’Arcy Ranch Commercial Surface Works

The expanding municipal area of Okotoks is now framed in at the north edge with the new D’Arcy Crossing mixed use shopping centre, anchored by Safeway, Shoppers Drug Mart, and other stores, designed to service the needs of the growing population. Implementation of bike racks, benches and green space planters to give a lasting impression for the neighborhood.

Bow Mark was part of the commercial surface works for laying the groundwork implementation, from site grading, granularbase, all asphalt paving, concrete site works, curb and gutter, and sidewalks, along with the asphalt pathways and line painting in the parking lot for flow of traffic and parking spaces, all while supporting the public mobility needs, planters and infrastructure for drainage for a safe place to shop.

Links:
Darcy Crossing



Cornerstone Commercial Surface Works

The expanding northeast neighborhood in the City of Calgary has a new Cornerstone shopping Centre serving the needs of the neighborhood.

Bow Mark was part of the commercial surface works for laying the groundwork implementation, from site grading, granular base, all asphalt paving, concrete site works, curb and gutter, and side walks, along with the asphalt pathways and line painting in the parking lot for flow of traffic and parking spaces, all while supporting the public mobility needs, planters and infrastructure for drainage for a safe place to shop.



Costco Distribution Expansion

As one of the nation's largest retailers, the Western Canada Costco Distribution Centre located in Highland Park, on the northern end of Airdrie was looking to grow its capacity.

Bow Mark was part of the Industrial surface works for the 700,000 sq ft expansion with stringent specifications and details in the groundwork implementation, from a new municipal access road, to site grading, granular base, curb and gutters, concrete dolly pads and concrete aprons. With that the customer choice of specialty asphalt roadway and parking lot areas specific to their needs. All completed with line painting for traffic and parking space allocations.

Links:
Major Projects Alberta



Cargill Site Improvements

Cargill’s High River facility is a fully integrated beef processing plant, and is a regulated facility by the Canadian Food Inspection Agency (CFIA) and adheres to the highest integrity.

Bow Mark was part of their Industrial Site Improvements for a concrete pad for the cattle truck turnaround, site access improvement on the north access for additional trucking lanes, and increased parking area, and pavement surface improvements.



COMMERCIAL & INDUSTRIAL
TRANSPORTATION INFRASTRUCTURE
RESIDENTIAL DEVELOPMENTS



REQUEST A QUOTE



COMMERCIAL & INDUSTRIAL SURFACE WORKS
RESIDENTIAL DEVELOPMENTS
TRANSPORTATION INFRASTRUCTURE
PROFILE
IN THE COMMUNITY
CAREERS
SAFETY
REQUEST A QUOTE
HOME



Bow Mark Paving © 2024 . All rights Reserved.
All trademarks and logos are the property of their respective owners.



Ph: 403.938.7920
Fax: 403.938.7283


145 Fisher Street, Okotoks, AB, Canada T1S 1A8